Learning objectives
- Distinguish expanding boundaries from a simple directional trend.
- Measure how a widening formation changes a fixed-size stop scenario.
Prerequisites: Calculate span between lines and risk per unit.
Mechanism and interpretation
A broadening construction uses boundaries whose separation increases over time. It may combine higher highs with lower lows, or other divergent slopes. The defining feature here is increasing span, not a claim that market participants are becoming irrational. Specify how alternating extremes are detected and when their anchors become available.
Widening geometry can materially change a trade's risk distance. An entry near one boundary with invalidation beyond the other has a larger nominal stop span later in the formation. Constant unit quantity therefore creates changing currency risk. A fixed risk budget would require a different quantity, subject to lot sizes and gap risk. Measure this consequence without assuming that either boundary will continue to contain price.
Worked case · synthetic data
Synthetic U(t)=105+0.5t and L(t)=95−0.5t produce width 10+t. Width is 12 at t=2 and 18 at t=8. A simplified one-point stop buffer beyond the opposite edge creates risk distances 13 and 19 for entries exactly at the upper edge. With a 260-unit currency risk budget and value 1 per point, whole-unit sizes are 20 and 13, respectively, before costs and gaps.
Failure modes and context
Extreme selection can exaggerate broadening if only the most dramatic swings are retained. A single gap may dominate the measured width. Constant-risk arithmetic does not cap realized losses when stop execution slips. The line-based scenario also assumes entry at the edge, which may be unavailable if confirmation occurs after a reversal.
Practice assignment
Let U(t)=310+0.6t and L(t)=300−0.4t. Compute widths at t=5 and t=15. Add a 2-point opposite-edge stop buffer and use a 240-unit risk budget with value 1 per point. Find whole-unit quantities and the unused nominal risk budget.
Worked answer
Widths are 15 and 25; buffered distances 17 and 27. Quantities floor(240/17)=14 and floor(240/27)=8. Nominal risk is 238 and 216, leaving 2 and 24 unused. These are planning figures under the stated entry and stop-price assumptions; gaps, fees and slippage can make realized losses larger.
Check your understanding
Question 1
What defines broadening in this lesson?
- A guaranteed reversal
- Increasing boundary separation
- Any upward trend
Reveal answer and reasoning
B. Increasing boundary separation
The upper-minus-lower span increases over the measured interval.
Question 2
What is width at t=15 in the practice?
- 25
- 15
- 10
Reveal answer and reasoning
A. 25
Initial width 10 increases by 1 point per bar.
Question 3
Why does fixed-budget size fall as the range widens?
- The asset becomes illegal to trade
- The risk budget automatically increases
- Each unit has a larger modeled stop distance
Reveal answer and reasoning
C. Each unit has a larger modeled stop distance
Quantity is constrained by budget divided by risk per unit.