TradeViora AcademyLearn. Analyze. Practice. Trade Smarter.
Menu

FREE FINANCIAL EDUCATION

Short straddle payoff calculator

Sell a same-strike call and put to receive premium while accepting losses from a sufficiently large move.

All 32 strategies · Movement and range

Understand the construction

Sell a same-strike call and put to receive premium while accepting losses from a sufficiently large move.

Default hypothetical position per one units multiplier
InstrumentStrike / stock entryPremiumSigned units
Call1005-1
Put1005-1

Worked example

At 100 the example earns its full credit 10. At 80 or 120 it loses 10. Break-evens are 90 and 110.

The uncovered call side creates unbounded loss as price rises. Margin can increase before expiry.

Explore the expiry payoff

Edit the legs below to test an alternative. The name above describes the default construction; changing quantities or strikes may produce a different strategy.

Formula and model boundary

10 − C100 − P100

Here S is the expiry underlying price; Ck means max(S−k, 0) for a call with strike k, and Pk means max(k−S, 0) for a put. The example formula is per unit, before fixed costs. The calculator multiplies the sum of signed leg P&L by your units multiplier, then subtracts total costs once.

The engine examines zero, every option strike, and the slope beyond the highest strike to find extrema. It solves linear segments for every break-even, including entire zero-profit intervals. It assumes a nonnegative underlying, one currency, one underlying and one expiry.

This is an expiry cash-equivalent diagram, not a live premium forecast. Volatility, time decay, interest, dividends, stock borrow, margin and liquidity can change pre-expiry results. Exercise, assignment, settlement and delivery obligations depend on the contract. Calendar and diagonal spreads need different expiry dates and are outside this model.

Reference and next steps

Original explanation and hypothetical numbers. Options Industry Council reference provides further background; its US contract examples do not define local contract specifications.

Compare another strategy · Explore pre-expiry pricing and Greeks · Estimate planned risk per lot